About the Business
ABC were asked to supply 1220 x 675 x 1200mm D400 loading EasyPIT access chambers to a site in Bolton, Lancashire as part of Balfour Beatty Utility Solutions AMP5 contract with United Utilities. The chambers were installed to provide access to the pressure reducing valve. Chambers were delivered to site in two halves allowing the installation to be finished within an hour. Due to the lightweight of the EasyPIT system, the chambers were easily positioned by hand removing the need for costly handling equipment.
ABC supplied over 30no 750 x 750 x 1050mm D400 loading EasyPIT access chambers to the Stoke Bardolph Sewage Treatment Works in Nottingham. The chambers were installed throughout the site to be used as cable drawpits for the on-going upgrade of this site as part of Severn Trent Water's AMP5.
ABC supplied over 40 EasyPIT access chambers together with galvanised mild steel access covers and frames to the M.O.D Donnington Logistics Centre in Telford, Shropshire.